Our factory experienced are based on biggest Infectious waste incinerator 60 Tons up to 100Kg-200Kg /Hr. The design can be change according to customer needs.
Specification
Capacity
100 Kg/ Hour and 200 Kg/ Hour.
Operating time
8 hours/ day ( Depends on each country labour working times )
Garbage ratio
Moisture less than 30%
Gas consumption
LPG gas ( Use only in case the temperature low-down to 800 Celsius, the burner will automatically process).
Standard design
1st Chamber : 800 C : Pyrolytic System.
2nd Chamber : 1,000-1,200 C : Eliminate Pollution.
Time to burn smoke: 3.0 second (Residence time).
Use gas or oil depends on customers specification.
Technical data and Our High technology.
Primary chamber :1st Combustion chamber is a solid waste incineration. 1st Combustion system components
Thickness of steel plate (Furnace wall)
Not less than 8 mm.
Heat resistance
Not less than 1,000 C
Primary & Secondary Air Fan ( Blower )
1 Set
Start-up Burner
1 Set
Temperature Controller & Thermocouple
1 Set
Secondary chamber is combustion fume of the Carbonization process from solid waste chamber. Combustion system components
Temperature in the combustion chamber
800-1,200 C.
Thickness of steel plate
Not less than 8 mm.
Heat resistance
Not less than 1,200 C.
Start-up Burner
1 Set
Temperature Controller & Thermocouple
1 Set
Scrubber system
To treatment air pollution and spray tank system.
Militi Cyclone (Coarse dust cyclone system)
Exiting Stack (Chimney) The material is made from stainless steel, thickness 3 mm, Ø 0.3 meters. The stack height from ground total 13 meters.
The trash door The door made from steel with thickness at least 8 mm weight 50 cm x height 50 cm. The open door use 8 cm steel thickness.
The ash removal door Door was structured by steel with thickness at least 8 mm weight 50 cm x height 50 cm. The open door use 8 cm steel thickness with Rope gasket heat. Compressed air tank and compressor fan. There are Compressed air tank to compress the air into the primary chamber, steel of this tank made by ASTM standard.
Air compressor and exhaust fan
Air compressor size 5 HP and 10 HP supply air fan to exiting stack (chimney).
LPG Gas tank
LPG Gas tank capacity 48 kg in 3 units.
Technical features Burners used Gas LPG as fuel in the combustion with electricity 380 V 50Hz three lines.
Burner in a Primary chamber given heat up to 200KW/ per burner.
Burner in a Secondary chamber given heat up to 200KW/ per burner.
Control by “ temperature controller”.
Furnace equipped with temperature measurement and control in 2 sets digital to set the desired temperature. For 1st and 2nd chambers have thermocouple model Type-K made by stainless steel Flange joints like Connector Heads and fittings.
Burners checked when installation is completed. It can be disconnect the burner for checking without removing the burner from the podium by Using hinge casting burners out of the fire.(Burners are imported from Japan and Europe.)
Electrical control cabinet The Electric system for control incinerators is under NEC (National Electric Code) standard and PID Temperature Controller. Equipment and cables are available standard equipment and for the electrical installation by using NEC (National Electric Code) Standard. We serve the very best to our value customer.
Personal protective equipment.
UV sunglasses 2 pcs.
Dust masks P95 Quality.
2 pairs of heat gloves.
Medicine cabinet and first aid
One set of Fire Extinguisher
Ash scoop stick
Training how to operate at site. Warrantyfor accessories or parts and quality of damaged, defective or damaged due to normal operation. One year warranty with experience engineers, full team after sales-service.